Tuesday, 20 April 2010
Campbell Associates Give Presentation
On 20th April 2010 John Campbell came to the Acoustic lab to demonstrate the latest equipment. The Microflown in-situ absoprtion measurement system was shown, as well as the new Cadna software. The Masters students asked their usual difficult questions...
Tuesday, 13 April 2010
Talk to RIBA Architects
Monday, 12 April 2010
Royal Academy of Engineering Award
Thursday, 1 April 2010
Strata Building at Elephant and Castle
Three 17 kW integrated wind turbines are currently being installed at the top of the highest residential skyscapper in the UK. At 42 floors the Strata building's urbines are expected to produce 89 MWhr of electricity per year. That should be enough to power 30 flats, or generate £32,000 through the new feed-in tariff every year!